철도이야기

Hitachi Class 800 trainsets begin testing in Japan
12 Sep 2014


Three Class 800 trainsets are now undergoing testing at Hitachi"s Japanese factory in Kasado.

UK: The first of three pre-series Class 800 intercity trainsets ordered under the Department for Transport’s Intercity Express Programme has begun low-speed running trials on the test track at Hitachi’s Kasado factory in Japan.

The first of the three bi-mode sets is expected to arrive in Britain early next year for trials on the East Coast Main Line, although Hitachi is discussing the possibility of using the Old Dalby test track.

A set of full-size vehicle mock-ups at industrial premises near Warwick has now been seen by more than 2 000 ‘stakeholders’ as the final part of an iterative process to finalise the design details well before the trains enter commercial service. Put together by DCA Design International, the mock-ups consist of a cab segment and sections of two cars with the interiors fashioned to replicate all the different areas of the TSI-compliant interior.

The cab is based on that of the Class 395 supplied by Hitachi for Southeastern services on High Speed 1, with some changes made following consultation with staff. Provision has also been made for driver-only operation.

The catering area is located at the outer end of one end car behind the cab and equipment area. A separate entrance and vestibule behind the cab is provided for catering staff. Hitachi says four catering levels are possible, but the DfT specification only covers Levels 1 and 4. Level 1 is a full galley, Level 2 would be a mix of a shop and buffet, Level 3 would be a larger shop, and Level 4 is a trolley.

A distinctive feature of the bi-mode trains will be the difference in floor heights between cars with and without diesel engines; the higher floor of cars with underfloor engines requires a transition slope at the end of the car, which may surprise passengers expecting a level passage between cars. A nine-car set will have five coaches with underfloor engines supplied by MTU, and a five-car will have three. The Class 801 electric trainsets will also have one underfloor diesel powerpack to provide emergency power instead of relying on back-up batteries.

http://www.railwaygazette.com/news/single-view/view/hitachi-class-800-trainsets-begin-testing-in-japan.html

이것, 첫 실사일까?3 양편성의 시험 차량은 일본에서 만든다고 써 있는데


日立、クラス800車両の試験始める

Hitachi Class 800 trainsets begin testing in Japan
12 Sep 2014


Three Class 800 trainsets are now undergoing testing at Hitachi"s Japanese factory in Kasado.

UK: The first of three pre-series Class 800 intercity trainsets ordered under the Department for Transport’s Intercity Express Programme has begun low-speed running trials on the test track at Hitachi’s Kasado factory in Japan.

The first of the three bi-mode sets is expected to arrive in Britain early next year for trials on the East Coast Main Line, although Hitachi is discussing the possibility of using the Old Dalby test track.

A set of full-size vehicle mock-ups at industrial premises near Warwick has now been seen by more than 2 000 ‘stakeholders’ as the final part of an iterative process to finalise the design details well before the trains enter commercial service. Put together by DCA Design International, the mock-ups consist of a cab segment and sections of two cars with the interiors fashioned to replicate all the different areas of the TSI-compliant interior.

The cab is based on that of the Class 395 supplied by Hitachi for Southeastern services on High Speed 1, with some changes made following consultation with staff. Provision has also been made for driver-only operation.

The catering area is located at the outer end of one end car behind the cab and equipment area. A separate entrance and vestibule behind the cab is provided for catering staff. Hitachi says four catering levels are possible, but the DfT specification only covers Levels 1 and 4. Level 1 is a full galley, Level 2 would be a mix of a shop and buffet, Level 3 would be a larger shop, and Level 4 is a trolley.

A distinctive feature of the bi-mode trains will be the difference in floor heights between cars with and without diesel engines; the higher floor of cars with underfloor engines requires a transition slope at the end of the car, which may surprise passengers expecting a level passage between cars. A nine-car set will have five coaches with underfloor engines supplied by MTU, and a five-car will have three. The Class 801 electric trainsets will also have one underfloor diesel powerpack to provide emergency power instead of relying on back-up batteries.

http://www.railwaygazette.com/news/single-view/view/hitachi-class-800-trainsets-begin-testing-in-japan.html

これ、初の実写だろうか?3両編成の試験車両は日本で作るって書いてあるけど



TOTAL: 5153

번호 제목 글쓴이 날짜 조회 추천
5153
No Image
젊은 벚꽃 철도젊은 사쿠라역에서 꽃....... RapidMoonlight 04-06 221 2
5152
No Image
일본 철도 극성팬들의 행위. avenger 03-16 669 0
5151
No Image
【전면 전망】키타호시육지 신간선 ....... umiboze。 02-22 1325 1
5150
No Image
스윗치 가방과 연명수의 역, 이즈모 ....... RapidMoonlight 02-10 1328 1
5149
No Image
싸움? 마지막에 히어로가 나타나는 masamasa123 02-06 1345 0
5148
No Image
미국 지하철에 설치하는 구조.. avenger 01-26 1308 0
5147
No Image
【전면 전망】JR화물 하코다테 화물역....... umiboze。 01-10 1454 1
5146
No Image
신간선과 KTX의 차이 (3) oozinn 2023-12-25 2178 1
5145
No Image
일본 제일 긴 노선버스. umiboze。 2023-12-17 1834 0
5144
No Image
헌국의 출근길 평범한 지하철 풍경의 ....... japjapjapjaps 2023-12-03 2135 0
5143
No Image
트윈 테일이 귀여운 여성 차장씨 masamasa123 2023-11-29 2218 0
5142
No Image
히타치계, 이탈리아 고속 철도 차량 ....... げきちん 2023-11-15 2391 0
5141
No Image
오토바이여행의 도중에 촬영한 게이....... RapidMoonlight 2023-10-16 2800 0
5140
No Image
영국 신간선 HS2(high speed 2) 건설공사 HI....... JAPAV57 2023-09-28 3231 0
5139
No Image
콜롬비아에서 싸구려 기차 타기 avenger 2023-09-22 2880 0
5138
No Image
EMU-320 고속열차 시운전 및 유튜버 초....... (2) domain 2023-08-25 3758 0
5137
No Image
판급, 2031년에 간사이 공항 직통에 umiboze。 2023-08-17 3718 0
5136
No Image
텍사스 신간선에 암트락크 참전.착공....... JAPAV57 2023-08-15 3936 0
5135
No Image
아이돌 택시. umiboze。 2023-08-04 3665 0
5134
No Image
세계 최고 속도를 실현한 일본의 초전....... (4) SongForAmerica456788 2023-07-03 4359 1